The Human Bean

Area Construction Group recently completed the site work and pad preparations for the new modular building of The Human Bean, a popular coffee shop chain, ensuring a smooth setup for the establishment’s new location.

The project began with comprehensive site work, which included clearing the land, grading the area, and ensuring proper drainage for the new structure. Area Construction Group then prepared a solid foundation, pouring a concrete pad to provide a stable base for the modular coffee shop building.

The team also handled the necessary utility connections, including water, power, and sewer, ensuring that everything was in place for the building’s installation. With attention to detail and a focus on precision, Area Construction Group completed the pad site preparation efficiently and on schedule.

Now, with the site ready to receive the new modular building, The Human Bean is set to bring its high-quality coffee and friendly service to the community in a brand-new location.

Mathnasium, Fairfax VA

Area Construction Group recently completed a full build-out for Mathnasium, a popular math tutoring center, transforming the space into an inviting and functional learning environment.

Throughout the build-out, Area Construction Group focused on creating a space that promotes concentration and comfort, aligning with Mathnasium’s mission to provide an optimal learning environment for students.

Aspen View Center Bathroom Renovations

Area Construction Group recently completed a full bathroom renovation at Aspen View Center, upgrading the space with modern features and improved functionality.

The renovation began with the demolition of the existing bathroom, followed by the installation of custom laminate millwork for the new sinks. New, efficient toilets were added, along with fresh wall and floor tiles for a clean, contemporary look.

To enhance privacy and accessibility, new bathroom partitions were installed. The team also swapped out the old lighting for energy-efficient LED lights and updated the ceiling grid and tiles, giving the space a polished finish.

With these updates, Aspen View Center now has a modern, durable, and more efficient bathroom, thanks to the expert work of Area Construction Group.

FINISHED PRODUCT

BEFORE PICTURES

Tumbles Kids Gym

In a rapidly growing market for children’s gyms, Tumbles Kids Gym sought to elevate the experience for its young clients by merging two existing locations into a larger, more versatile space. To accomplish this ambitious project, Area Constuction Group took on the challenge of transforming the 3,600-square-foot space into a vibrant, functional, and safe environment for children to learn and grow. With unique design elements like a 24-foot open ceiling concept and 12-foot acoustical ceilings for classrooms, the completed space is a true testament to the company’s craftsmanship and understanding of client needs.

Smoothie King, Germantown MD

In the world of quick-service restaurants, creating an inviting and efficient space is paramount. When Smoothie King needed a new location to serve up fresh, nutritious smoothies to their loyal customers, Area Construction Group stepped up to deliver a stunning and functional build-out. The transformation of this space reflects both the brand’s mission and the construction company’s commitment to quality and attention to detail.

The first step in the process was clearing the space and ensuring the infrastructure was up to code. The team worked seamlessly with the architects to bring the vision to life, installing custom cabinetry, specialized equipment for food prep, and bright, inviting signage. The kitchen area was outfitted with state-of-the-art machinery to ensure efficiency in delivering fresh, high-quality smoothies every time.

Despite tight deadlines and unforeseen logistical challenges, the team at Area Construction Group was able to overcome these hurdles through careful planning and communication. A particularly challenging aspect was sourcing the necessary equipment for the kitchen within a short timeframe, but the team worked with suppliers to expedite the process.

In keeping with the brand’s commitment to health and sustainability, the team chose energy-efficient lighting and eco-friendly materials wherever possible. The use of low-VOC paints and sustainably sourced wood created a healthy environment for both employees and customers.

The finished store offers a bright and welcoming environment, with smooth lines and an open layout that allows for quick service. The bold colors of Smoothie King’s branding are prominently featured throughout the store, while the efficient kitchen layout ensures that smoothies are prepared quickly without compromising quality. Customers can relax in the modern seating area or grab their smoothies on the go.

The Good Feet Store, Rockville MD

Here, one of our repeat clients tasked us to with the complete build-out of their new location for The Good Feet Store, a retailer known for its foot health solutions. From the initial layout to the final finishing touches, the construction team worked to design a space that was both inviting and practical, enhancing the customer experience and supporting the brand’s mission.

The design focused on creating an open, spacious floor plan that would allow customers to browse and engage with the products easily. With various foot care solutions, such as insoles and orthotic products, the layout included designated areas for consultations, product displays, and test fittings.

Lighting played a critical role in the build-out, as it was essential to both showcase the store’s products and create an inviting atmosphere. The construction company installed modern, energy-efficient LED lighting to ensure that the store’s products were brightly illuminated and easily visible from every angle.

The choice of flooring was particularly important for The Good Feet Store, given its focus on foot health. The construction team carefully selected high-quality, durable flooring materials that would withstand foot traffic while still providing a comfortable feel underfoot. The flooring was chosen not only for its durability but also for its sleek, modern appearance that complemented the store’s overall design.

A major part of the build-out was the installation of a new entrance and prominent signage that would make the store easy to find and enticing to customers. The entrance was designed to be open and welcoming, drawing people in with a visually striking display of the store’s branding.

Dr. Rebecca Resnik’s Office, North Bethesda MD

We were approached by Dr. Resnik when she wanted to create a more welcoming, professional, and soothing environment for her clients. We were able to help her accomplish this by focusing on subtle yet impactful design improvements.

The renovation included a range of upgrades, from installing corner moldings to replacing windows and doors, all designed to enhance both the functionality and aesthetic appeal of the office.

To further elevate the office’s atmosphere, wainscoting was added to the lower portions of the walls. This classic feature not only contributes to the visual appeal but also provides a tactile element that helps in sound dampening, creating a more serene and private space.

Chair rails were installed along the walls to protect the wainscoting and lower portions of the walls from scuff marks caused by chairs or other furniture. The chair rail also serves a dual purpose as a design element, providing a clean, horizontal line that visually divides the room, enhancing the overall layout.

To complete the look, new trim was installed along the baseboards, windows, and doors. The trim adds a finished, polished appearance to the space, reinforcing the sophisticated design that reflects the office’s professional and calming environment.

Office Expansion, Silver Spring MD

During Summer of 2023, we completed an interior office expansion for Loughlin Management (now Thomas Park Management) at 2431 Linden Lane.

This job showcases another one of Area Construction’s expertise in renovating office space. As a business grows and changes over time, the effects of a dated office and layout become more apparent. Updating or expanding the an office space eventually becomes crucial to their evolving needs and business operations.

That’s where Area Construction Group comes in! We work with the client to ensure we build out a tailored interior environment that fits with their operations.

See the list below for some interesting highlights from this office expansion:

  • Demolition of an existing spiral staircase, as well as the usual demolition of walls, doors, cabinetry, and flooring
  • Reconnecting suites via wall layout and new door openings
  • Painting of all new walls, doors, and frames
  • Installation of carpet and VCT within the expanded office

Smoothie King, Ellicott City MD

We’ve done so many Smoothie King buildouts that we’re beginning to lose count!

Ok, maybe that’s an exaggeration, but we’re excited that we’ve been able to showcase our expertise with yet another successful buildout for a Smoothie King Franchise.

Now Ellicott City in Maryland has a new place to grab refreshing and healthy Smoothie blends! Completed early fall of 2023, we’re happy to help add another exceptionally well done Smoothie King franchise to the continuously growing list!

Check our the Smoothie King website to learn more about what makes their smoothies so delicious: https://locations.smoothieking.com/ll/us/md/ellicot-city/9050-baltimore-national-pike-suite-103/

Considering stopping by to grab a smoothie while you check out our work? The full address for this Smoothie King is 9050 Baltimore National Pike, Suite 103, Ellicott City, MD 21042

DC Public Defender’s Office – Chesapeake Mission Critical

Through our client, Chesapeake Mission Critical, we assisted in managing a small data center and office buildout for the DC Public Defender System.

Located at 633 3rd St NW, in Washington DC, we provided management expertise and a full-time, onsite superintendent to ensure the smooth progression of the project. One of the challenges of this buildout was juggling the coordination of our sub-contractors with the building GC’s other subcontractors, while still ensuring the project progressed smoothly.

Even a small datacenter buildout includes scheduling complexities that need to be managed efficiently. For example, consider the importance of effectively allocating the installation of UPS systems (Uninterruptible Power Supply), specialized raised flooring, data center cabling, specialized cooling pipes, other technical equipment, fire suppression and alarm systems, and other technical data center equipment. All of these details must be timed appropriately in order to keep the project running smoothly and on schedule.

One of the benefits of having an experienced General Contractor, such as Area Construction Group, handling your project is that they have the expertise to handle unexpected challenges that arise during the project. The size of the datacenter and the layout constraints created a unique issue in Meeting ADA requirements at first; However, thanks to effective coordination between us, the architect, our specialized datacenter flooring contractor, we were able to figure out an equally unique solution and complete the job accordingly.

Construction-In-Progress